The Christmas shutdown is one of the few times a year when everyone on site needs the same information at the same time, and it’s when information is most likely to get lost between shifts. Night shift hears one date, days hear another, and the agency staff who started in November hear nothing at all. A factory Christmas shutdown board fixes that by putting the whole plan in one place, where every shift walks past it. This guide shows how to lay one out panel by panel, built around the 4 Panel Mobile Folding Display Kit (Aluminium Frame).
What a factory Christmas shutdown board has to answer
Before designing anything, list the questions your supervisors get asked every December. In most factories and workshops they look something like this:
- When is the last production shift, and when do we come back?
- Who is on site over the break, and who do I call if something goes wrong?
- What has to be shut down, isolated, cleaned or locked before I leave?
- Is any maintenance or contractor work happening while we’re away?
- What happens on the first morning back?
If the board answers those five questions clearly, it has done its job. Everything else is optional.
Why a mobile board works well for this
A shutdown board only needs to be up for a few weeks, and the best spot for it changes. In the run-up to the break it belongs by the clocking-in point or canteen. On restart day it may be more useful at the start of the line or in the briefing area. A board on castors can follow the message.
According to the product page, the 4 Panel Mobile Folding Display Kit has:
- Four pre-hinged panels, each 1775mm h x 878mm w (excluding the frame)
- An aluminium frame with eight lockable castors
- Flame-retardant Nyloop fabric on both sides, in a large choice of colours
- Fabric that takes both pins and hook adhesive tape
- A weight of 21kg
One thing to plan for: the mobile boards must stand in a zig-zag or U shape and can’t be used in a straight line. Measure the space by the clocking-in point first, so the angled panels don’t push into a walkway or a fire route.
A panel-by-panel layout
Give each panel one job. Because the fabric covers both sides, you can use the reverse for a second audience, such as contractors or the maintenance team.
| Panel | Front side (all staff) | Reverse side (maintenance and contractors) |
|---|---|---|
| 1 | Key dates: last shift for each team, the shutdown period and the restart date, in large type | Planned maintenance window and which areas are affected |
| 2 | Before you leave: the shutdown checklist for each area, signed off by the area lead | Isolation and permit arrangements, with the name of whoever issues permits |
| 3 | Who’s on site: security cover, on-call managers and emergency contact numbers | Contractor sign-in procedure and site rules for the break |
| 4 | First day back: start times, restart briefing location and any changes to the line | Handback checklist: what must be checked before equipment returns to production |
Keep the content on the front panels short. People read them while queuing for the clock or a coffee, not at a desk.
Adding a second board at the gatehouse
Drivers, visitors and contractors arriving during the break may never reach the canteen. A smaller freestanding board at the gatehouse or goods-in office covers them. The 3 Panel Junior Folding Display Kit (Aluminium Frame) is a slimmer option. The product page lists:
- Three panels, each 1819mm high x 633mm wide including the frame
- An aluminium frame with plastic hinges, ready to use straight out of the box
- Flame-retardant Nyloop fabric that meets Type B requirements of BS5867 Part 2 2008
- A weight of 13kg
Use it for goods-in opening hours over the break, the security contact number, and where contractors should report. Keep the message identical to the main board, so nobody gets a different date depending on which door they used.
When to put it up and when to take it down
- Early December: put the board up with the key dates panel completed. Add the other panels as each detail is confirmed, rather than waiting until everything is final.
- Final week: the checklist and on-site cover panels should be complete. Mention the board at every shift briefing, so staff know it’s the single source of truth.
- Last shift: area leads sign off their checklist on the board.
- First day back: roll the board to the briefing area, with the restart panel facing out.
- A week after restart: take the sheets down, file them, and note what you’d change next year.
Five mistakes to avoid
- Dates without a year or a day of the week. “Back on the 5th” causes arguments. “Back Monday 5 January, 6am” doesn’t.
- Personal mobile numbers on a public board. Use role-based or on-call numbers wherever you can.
- Undated updates. Add a “last updated” line to each panel, so staff know they’re reading the current version.
- Too much text on the checklist panel. Link to the full procedure instead, and keep the board to the items people actually forget.
- Running out of fixings. Laminated sheets go up quickly with a pack of Push Pins, which are made for pinning posters onto display boards. Keep a spare pack with the board.
After the break
Once production is back up, the same mobile board can carry on working. Many sites use it for daily stand-ups, as in our guide to using a shift huddle board, or for safety campaigns like a health and safety week display. If the shutdown board worked well, the 4 Panel Mobile Folding Display Kit can simply become your permanent communication board for the rest of the year.
You’ll find more display board ideas for construction, engineering and manufacturing on our hub page.
Planning your shutdown communications now? Boards are made to order, so it’s worth ordering in good time. Call 01733 855108 or contact us, tell us where the board will stand, and we’ll help you choose the right kit and fabric colour.
