It’s the Monday after the move. Forty people are standing in a new reception asking the same three questions: where do I sit, where’s the kitchen, and why doesn’t my pass work? Good office move communication answers those questions before anyone has to ask, and the most reliable way to do it is a physical hub people walk past every day. A 4 Panel Mobile Folding Display Kit on lockable castors can follow your team from the old building to the new one.
Emails get buried and intranet pages go unread during a relocation. A board in the corridor, updated weekly, becomes the single place staff check. This guide follows a typical mid-sized office through the move and shows what to put on the boards at each stage.
Why office move communication needs a physical hub
Relocations generate a flood of small, practical details: floor plans, crate labels, parking changes, new access routines. Most of it changes as the date approaches. A display board works well here because:
- It’s always on. Staff see the latest plan on the way to a meeting, without logging in.
- It’s easy to update. The Nyloop fabric takes pins and hook tape, so you can swap a single sheet when a date moves.
- It moves with you. The mobile kit has lockable castors, so the same hub can stand in the old office, roll onto the removal van and reappear in the new reception.
- It’s double-sided. Both sides are covered in fabric, giving you room for two audiences, for example general staff on one side and team leads on the other.
A three-phase plan for your move hub
Phase 1: Six to eight weeks before the move
Wheel the hub into the busiest corridor of the current office. At this stage people want reassurance and the big picture.
- Moving date, new address and a simple map with transport links
- Photos or renders of the new space
- Draft floor plan showing team zones (mark it clearly as a draft)
- A named contact for move questions, plus an anonymous question box beside the board
Phase 2: Moving week
Now the content becomes operational. Keep it short and scannable.
- Packing deadlines by team and the crate labelling system
- What IT will move and what staff must pack themselves
- Last working day in the old building and first day in the new one
- What to do if something goes missing
When the hub travels, lock the castors once it’s on the van and again when it reaches its new position.
Phase 3: The first fortnight in the new office
Place the hub in or near reception. This is when it does its most useful work.
- The final floor plan, with desks, meeting rooms, quiet zones and kitchens
- Fire exits, assembly point and first aiders in the new building
- Access passes, visitor sign-in and parking rules
- A “known snags” sheet showing what’s being fixed and when
What goes on each section of the board
Split the display into four clear sections, one topic each, so people can find what they need at a glance.
| Section | Before the move | After the move |
|---|---|---|
| 1 | Date, address and map | Final floor plan |
| 2 | New space photos | Fire safety and first aid |
| 3 | Draft team zones | Passes, parking and visitors |
| 4 | Packing timeline and contact | Known snags and feedback |
Use Hook Velcro Coins for laminated sheets you’ll reuse, such as the map and fire exit plan. A roll contains 200 self-adhesive coins that grip the loop fabric, so sheets come off cleanly when they’re replaced.
Add a desktop board for reception and team areas
A floor-standing hub works for corridors, but you may also want a smaller display on a reception desk or a team’s breakout table. The 3 Panel Maxi Desktop Display Kit has three panels, each with a fabric area of 880mm h x 574mm w, plus a 272mm header you can use for “Welcome to our new office”. It weighs 5kg and comes with a cardboard carry case, so it’s easy to set up on the first morning.
Practical tips from the move itself
- Date every sheet. During a move, old information is worse than none.
- Use a consistent colour code for each team zone, and match it on the floor plan and crate labels.
- Keep fire routes clear. Position the hub where it won’t narrow a corridor or block an exit, and stand it on a level floor.
- Choose a fabric colour that suits the new space. The kit comes in a large range of colours, with a black or grey frame.
- Plan its next job. After the move, the same board becomes a noticeboard, a training aid or a wellbeing point.
For ideas on that next job, see how one board can serve every department across a corporate HQ, or how mobile boards help in hybrid offices. You’ll find more display board ideas for offices and corporate teams on our hub page.